Licensed · Bonded · InsuredCSLB LIC. #1144503neodemoandhauling@gmail.com
818.208.0589
Finished Homes · Tenant Improvements

Selective Demolition in Los Angeles

Selective demolition means taking out exactly what the plan calls for and protecting everything else. It is the work that happens inside finished homes, occupied offices and retail spaces where the floors, walls and fixtures next to the demo area have to stay in perfect shape. NEO Demolition & Hauling provides selective demolition in Los Angeles for homeowners, designers and general contractors.

Think of opening a fireplace wall in a modern living room with new wood floors, or removing one set of partition walls in an office while the rest of the suite stays untouched.

5.0 ★ Google reviewsOur own trucks & equipmentFree estimates

Request a quote

Tell us about your project and we'll get right back to you. Prefer to talk? Call (818) 208-0589.

Prefer email? neodemoandhauling@gmail.com

Residential & CommercialComplete Site DemolitionInterior & Exterior DemolitionConstruction Site Clean-upsSite Clearing & Debris RemovalConcrete & Pavers Demolition

When selective demolition is the right call

Selective demo fits any project where the space around the work is already finished or still in use. It is common in high-end home remodels, partial renovations and tenant improvement projects. The scope is usually small in area but high in precision, and the crew's habits matter more than the size of the equipment.

  • Opening or removing a wall, fireplace surround or built-in
  • Removing a kitchen island, counters or one run of cabinets
  • Taking out a single bathroom inside a finished home
  • Tenant improvement demo of specific walls, ceilings or flooring areas
  • Removing finishes for a design change while the structure stays
  • Opening walls or ceilings for plumbing, electrical or structural access

Protecting finished floors and surfaces

Before any tool comes out, we protect the path from the door to the work area. Ram Board goes down on finished floors, plastic sheeting goes up on walls and doorways, and nearby fixtures are covered or moved. In homes with new hardwood, stone or polished concrete, this step is not optional.

The work area itself is sealed off as tightly as possible, so dust stays where it is created.

Protecting finished floors and surfaces

Controlled removal, piece by piece

Selective demolition is slower than a full gut on purpose. Materials are cut and removed in pieces sized to carry out safely. Drywall is cut along clean lines so the patch is easy for your finisher. Stone and tile are taken off without shock that could crack the surface next to them. We check for wiring, piping and ductwork before cutting into any wall or ceiling.

Selective demolition for tenant improvements

In commercial TI projects, selective demo often means removing a few walls, part of a ceiling grid or a section of flooring to match a new layout. The rest of the suite and the building's common areas must stay clean and usable. We coordinate with the GC and the building manager on access, hours and loading so the work fits the building's routine.

Selective demolition for tenant improvements

Clean every day

With selective work, cleanup happens all day long. Crews vacuum and sweep throughout the day, debris is carried straight out to our truck, and the space is left tidy each evening. In occupied homes, that means you can keep living around the project. Customers have mentioned how spotless we left their homes.

Working with designers and contractors

Selective demolition is usually one step in a bigger design. We review drawings or walk the space with your designer or GC, mark what comes out and confirm what stays in writing. If something unexpected appears once a wall is open, we stop and check with you before going further. That habit protects your budget and keeps the remodel on plan.

How the job runs

  1. 01

    Walk and mark

    We review the plan on site and mark exactly what comes out.

  2. 02

    Protect

    Floors, walls, fixtures and the route out are covered and sealed.

  3. 03

    Remove with care

    Materials come out in controlled pieces, with checks for hidden utilities.

  4. 04

    Clean and hand off

    We vacuum, sweep and leave clean edges ready for the next trade.

Satisfied clients

5.0 stars on Google. If a client is not happy, our job is incomplete.

Google review★★★★★
“Absolutely great experience with Avi and his team at Neo Demolition. Their pricing was competitive, but what stood out the most was their on-time, communicative, and clean work. … At the end, the team left the house spotless, perfectly ready for the next stage of construction.”
Navid O.
Google review★★★★★
“I used NEO for a full interior demo on a 1000sqft house. They were quick, efficient and fairly priced. Avi is on top of it and is a prompt communicator and the crew knows what they’re doing… Definitely recommend them.”
Matt Jacoby
Google review★★★★★
“The best! So impressed with Avi and his crew - they used special care to not create a lot of dust in my kitchen cabinet demo and left the area spotless once the work was done. Highly recommend!”
Jerilyn Blair

Selective Demolition FAQs

What is the difference between selective demolition and a full gut?

A full gut removes everything down to the framing. Selective demolition removes only specific items and protects the finished spaces around them, so it takes more planning and care.

Can you open a wall without damaging the rest of the room?

Yes. We protect floors and nearby surfaces, cut the drywall along clean lines and contain the dust. Your finisher gets a clean edge to patch.

Do you check for wires and pipes before cutting?

Yes. We check before cutting into walls and ceilings, and we stop and ask if we find something that is not on the plan.

Can you do selective demo in an occupied office?

Yes. We coordinate hours, access and loading with the building, protect common areas and keep the work contained.

What if you find something unexpected inside a wall?

We stop and show you or your contractor before going further. Old wiring, plumbing, water damage or framing problems are common surprises in older homes, and decisions about them should be made by the people running the remodel.

Can I stay in my home during selective demolition?

Most clients do. The work area is sealed off and cleaned daily, so the rest of the house stays livable.

Ready to get it torn out and hauled away?

Free estimates across Los Angeles. Licensed, bonded and insured, CSLB #1144503.

Call nowFree estimate